File:C&O Canal, Mill during a flood.jpg: Revision history

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

3 September 2018

31 August 2018

  • curprev 13:4713:47, 31 August 2018HistoryCommission2 talk contribs 266 bytes +266 C&O Canal On back of photo: The rear of Mill during a flood. Note the water over the control gates on the canal (east end). The mill burnt down in 1972 and a new mill (Brunswick C0-Op) was opened on Sounder Road. The canal stopped operation in 1924